Casa Nueva Office Building
Wednesday, January 22, 2002
 

Roof Trusses and Interior Wall Framing...

Exterior wall going up (left) Waterproofing on block walls (mid) Architect and Builder confer on a detail (right)...

 

Waterproofing on block walls (left) Window sill (mid) Exterior wall (right)

 

Exterior walls going up (top left) Milled window sill stock (top right)
Carpenter milling window will stock (bottom)

 

Elevator wall attachment detail (top left) North wing courtyard side (top right)
South win second floor steel stud stock (bottom)

   

Second floor toward main lobby (left) Dirt Pile going (right)

 

A "David Hockey" of the main lobby, Architect in orange jacket.

 

View of courtyard from access ramp start point (near San Antonio Building)

 

Panorama