Office of the
County Architect |
Casa Nueva Office Building
Tuesday, May 21, 2002Excavating Footings--Steel
Placement |
 |
 |

Elevator Pit
Elevator pit was lowered to accommodate the substitute elevator. |
|

Footing and grade beam steel...
Staking and tie wires hold the steel in place until concrete can be
poured. There are also small concrete blocks the bottom steel sit on...which
becomes part of the footing when concrete is poured. |
|

Laying out the next grade beam steel...
Weaving the web of steel in compliance to the engineering
drawings is like working a puzzle...getting the right bar in the right
sequences. |
|

One Section Completed.
This section is ready for concrete. |
|

Retaining Wall area (right side of picture)
Perimeter footings and utility conduits go in. |
 |
 |
|
|
 |
 |