Casa Nueva Office
Building Wednesday, June 5, 2002 Third Concrete Pour |
|
|
|
|
Retaining Wall and Footings Leading to... Brian with crew works at pouring the retaining wall footing and lead footings to this retaining wall. |
More Mud... Jack working the pumper truck and Brian and crew work the mud... |
||
After each pour, there are number of steps to prepare the footings for the slab...that follows. Here making sure the top of footing is correct and (right) a "key" joint to tie the slab to the footing. |
||
![]() ![]() Retaining wall footing
partly in... |
||
![]() Pouring the "mud"...Mud Setting |
||
The formwork that holds the vertical concrete in-place is being assembled. It is a series of metal "I" beams in a cross-hatch pattern with concrete form-boards attached to the concrete form side. . |
||
![]() |
||
looking across the site to the retaining wall and the concrete pump truck... |
||
![]() Panorama... |
||
Progress... |
||
|
|
|
|
|
|
||