Casa Nueva Office Building
Friday, June 7, 2002

Formwork...Plumbing...

060702-02.jpg (116810 bytes)

 

Carving a path for pipes....

Here the plumbing contractor is carving a path for the pipes and conduits to be routed to other parts of the building..

060702-04.jpg (83856 bytes) 060702-01.jpg (81446 bytes) 
 
Making Connections...

Once the slab is in...these will never be seen again...until we take the building down 40 years from know.

060702-03.jpg (75944 bytes)   
Vertical Shear wall steel.

The vertical and horizontal reinforcement bars are being placed...the formwork for the concrete is being assembled just the right.

060702-05.jpg (67310 bytes)

A steam line from 1918....
Is is live? That was the questions...let's find out.

060702-06.jpg (71726 bytes)


 

060702-07.jpg (77943 bytes) 060702-08.jpg (79556 bytes) 060702-09.jpg (68611 bytes)

After a short test...out comes the 1918 pipe
Here the plumbing contractor removes the old 1918 steam pipe that provided heat to the old Casa Nueva.

060702-10.jpg (135419 bytes)   


Elevator Formwork Assemble...

The carpenter's assemble the elevator form work...getting ready to make the last pour before the slab goes in..

 060702-12.jpg (80873 bytes)

 
Making Room For The Pipes

Here the plumbing contractor carves out the grade to make room for pipes.

060702-13.jpg (76164 bytes)
Sleeves in the Footings...

There are many locations where sleeves were placed so plumbing pipes could be installed after the footings set.

060702-14.jpg (79659 bytes)

Pipe Trenching....
At the bottom of this picture you can see the grey conduits that need to be routed across the building...the plumber is doing that know with the backhoe.