Casa Nueva Office
Building Wednesday, July 10, 2002 Formwork...Steel...Concrete Pour |
|
|
|
|
Formwork coming down at retaining wall...formwork "block-out" in slab. Slab "block-outs" are used to hold the slab concrete away from areas of later work. In this case steel columns will be placed, then the area will be filled with concrete to finish the slab. |
Formwork "Block-out" and vertical steel awaiting formwork |
||
|
Sergio (left in green) and helper working on "block-outs". |
||
|
||
|
|
||