Wednesday, August 21, 2002Steel Columns
Arrive, Concrete Slab in, and
Next Retaining Wall
Continues... |
 |
 |

Hold-Out for steel column

Worker prepares steel tie-in at retaining
walls...(right) under floor conduits to computer room |
| |
|
| |

Steel Column base and weld
detail.
Heavy side flange provide lateral connection for earthquake
and wind force transfer to the concrete footings. |
| |

Steel Columns lined up and
ready to go in the building...
|
|

Restroom slab-hold-out. This is done to
allow the tile floor to slop
toward floor drains (one is toward the bottom of this photo)
|
|
Under floor conduit is painted for better visibility by other
trades.
|
| |
|

Formwork on second retaining
wall....steel mesh detail |
|
|

Formwork on second retaining wall....from the front side |
|
|

Wall support columns are in... |
|
|

Slab and Shear walls from
courtyard side...
|
|
|

Panorama
|
 |
 |
|
 |
 |