Casa Nueva Office Building
Wednesday, August 28, 2002

Next Retaining Wall Continues...

 

Slab Depressions Poured...

Areas shown with cardboard protect either floor drains or steel column bolt locations.
The blue anchor bolt placement holder is still connected, this will be removed as part of the slab
cleanup.

Worker prepares depression foam locations. The architect has
designed the wall with reveals...tricky formwork.

 

Retaining wall extension...

 

 

Elevator fix...

 


9" slab depression in the computer room...

 
Panorama