Casa Nueva Office
Building
Wednesday, September 18, 2002
Steel Beam Prep Continues...Utility
Trenching Begins... |
 |
 |

A Look Back...
On the left is what was....on the right is
what is. How time flies when you are having fun.
|
| |

Letting the "mud" cure.
|
| |

Walls are almost
done...waterproofing is in...
|
| |
Preparations of 4x6 bearing plates on steel
beams.
|
|
|

Utility trenching...the "red" lines on the ground mark the path of
trenching.
|
|
|
Left photo shows the "ground wire" about the same size as the water bottle
cap...the right photo show the tie-in with conduit placed under the slap
before concrete was poured. |
|
|

Arc Welding connection...a chunk of steel cut
from a beam...finish concrete floor. |
|
|
The Finish
concrete floor needs protection... |
|
|


Second lift on the elevator...the
decorative wall cures...forms come off soon. |
|
|