Casa Nueva Office Building
Wednesday, September 18, 2002
 

Steel Beam Prep Continues...Utility Trenching Begins...

 

 A Look Back...

On the left is what was....on the right is what is. How time flies when you are having fun.

 

Letting the "mud" cure.

 

 

Walls are almost done...waterproofing is in...

 

Preparations of 4x6 bearing plates on steel beams.


Utility trenching...the "red" lines on the ground mark the path of trenching.

 

 
Left photo shows the "ground wire" about the same size as the water bottle cap...the right photo show the tie-in with conduit placed under the slap before concrete was poured.

Arc Welding connection...a chunk of steel cut from a beam...finish concrete floor.
 

The Finish concrete floor needs protection...

 

Second lift on the elevator...the decorative wall cures...forms come off soon.

 
Panorama