Wednesday, September 25, 2002
Steel Beam Prep Continues...Utility
Trenching Begins... |
 |
 |
Steel structure next to concrete shear
walls...the silver straps are seismic ties to the floor system...
|
| |

Cleaning and Patching the
Concrete.
|
| |
Residue of Styrofoam formwork.

Yvonne is proud of "her" wall...
|
| |

Iron Worker Installs Bolts...(far right--iron
flange to support second floor wall...)
|
|
|

Steel Frame as seen for parking lot below.
|
|
|
Iron Worker
Installs Bolts 
Steel Frame Go Up! |
|
|

Second "lift" or pour on the elevator
shaft...Steel Floor Beams Go In. |
|
|

Panorama
|
 |
 |
|
 |
 |