Casa Nueva Office Building
Wednesday, November 27, 2002
 

Steel Beam Installation Continues...Floor Trusses continue...HVAC begin...

 
Beam installation...sequence

   

 
Floor Truss Installation...

   

 
HVAC Ducting: noise damping insulation (left)...First Floor Supply/Return Feeds (2 right photos).

Noise insulation (2 left photos)...View of Supply/Return ducts from second Floor (right)
These ducts will travel up to the roof, where connection to HVAC equipment occurs.

   

 

Floor Trusses Bracing (left)...Drain Line goes in (right).

 

  
Welding of "k" bracing...

 

   

 
Josh (tan pants) and co-worker install HVAC vertical drops (left)...Fire Sprinkler tie-in.
 
Corner looking toward San Antonio Building...

   

 
Panorama