Wednesday, December 4, 2002
 

Floor Trusses Continue...HVAC begins...

 
Beams cut to allow fire sprinkler pipes (left)...interior walls marked (right)

"K" brace shear plate welded and grouted (left)...Concrete block walls begin (right)

     

 
Lobby bridge framing in (left & bottom)...Steel Beam detail (right)

     

  
Two views of the same area...interior (left)...exterior from second floor (right)

     

 

Concrete block walls begin...expansion joint detail (left)...a 4" communications conduit is insert into the wall.

   


Western edge of the building as seen from a new parking area.

 
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Metal stud walls begin...exterior (left)...interior (right)

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Another view of concrete block wall

     

 