Casa Nueva Office Building January, 2002 to June 2002 Change Over Time |
|
|
|
||
|
Home |
July on... |
|
![]() Feb 4th.: Demolition is Underway. The original Casa Nueva comes down. |
||
|
The Contractor, Architect and County Architect PM are just to the lower right. |
||
![]()
April 1st.: Vegetation Goes. |
||
|
A husband and wife team begin the grading operations to prepare the site for the new building.. |
||
![]()
April 17th.: The BIG dig is on! |
||
![]() April 24th.: Grading Continues The D-8 is some ten feet lower than the pavement to the right. |
||
![]()
May 1st.: Grading
Continues... |
||
|
The site is now ready for the layout and excavation of building footings. |
||
![]()
May 15th.: The foundation
sub-contractor is underway. |
||
![]() May 21st.: Steel going in! The area is where the large retaining walls will go. |
||
![]() May 22nd.: Steel continues to going in! All footings area have some level of working underway. The building is "L" shaped, we are viewing the "L" from the inside bend. |
||
![]() May 31st.: With 2 concrete pours...things move fast. This is the second pour of concrete...11 trucks...several hundred yards of concrete. |
||
June 5th.: With 3 concrete pours...things move fast. This is the third pour of concrete...13 trucks...several hundred yards of concrete.
|
||
|
June 12th.: Work Has Gone Vertical The elevator pit, vertical shear walls and retaining wall have begun to take shape. |
||
|
June 17th.: Work Has Gone Vertical Vertical shear wall concrete was poured today. |
||
![]() |
||
|
|
|
|