Casa Nueva Office Building
July, 2002 to December 2002

Change Over Time
(this page takes a long time to load)

 

   

July 3rd.: Retaining Walls gets mud...

   


July 10th.: Formwork coming down...

   


July 17th.: Second Floor Shear Wall Forms go up...

 

   

July 24th.: Second Retaining Wall has begun...

   

July 31st.: Second Retaining Wall continues...

   

Aug 7th: Concrete Slab Prepr, Second Retaining Wall continues...

   

Aug 14th.: Concrete Slab Prep and Pour, Second Retaining Wall continues...

   

Aug 21st.: Second Retaining Wall continues, Steel Columns Arrive...

   

Aug 28th.: Second Retaining Wall continues, Steel Columns Arrive...

   

Sept. 4th.: No Update

Photo of New York fire worker taking a break amongst the debris of the World Trade Center. FEMA photo by Andrea Booher
America Remembers

Sept. 11th.: Second Retaining Wall continues, Steel Columns Go Up...

 

   

Sept. 18th.: Second Retaining Wall continues, Steel Columns Go Up...

   

Sept. 25th.: Second Floor Steel Frame Goes In...

   
Oct. 2nd.: Second Floor Steel Frame Continues...
    No Updates for Oct. 9th and 16th.
   
Oct. 23rd.: Second Floor Steel Frame Goes In...
   

Oct. 30th.: Second Floor Steel Frame continues...courtyard ramp walls begin...

NO REPORT FOR NOV. 6th

   

Nov. 13th.: Second Floor Steel Frame continues...Floor Trusses Begin...

   

Nov. 20th.: Second Floor Steel Frame continues...Floor Deck Begins...

   
Nov. 27th.: Second Floor Steel Frame continues...Floor Deck Begins...
   
Dec. 4th.: Second Floor Trusses continues...HVAC System begins...
   

Dec. 11th.: Block walls begin...HVAC System continues...Fire Sprinkler System begins...

   

Dec. 18th.: Block walls begin...HVAC System continues...Fire Sprinkler System begins...

   

Dec. 24th.: Block walls begin...HVAC System continues...Fire Sprinkler System begins...