Project Team
|
Construction
|
Architecture Design Direction, Architectural Programming Design Architects Design Concept, Building Design
Ken Radtkey,
AIA
Yianni
Doulis |
|
|||||
| Structural Engineering Ehlen & Spiess, Inc. provided the structural design for this very intricate building. A number of large retaining walls provide space for the lower floors. 1119 Garden Street John Spiess, P.E. |
Landscape Architecture Van Atta Associates 235 Palm Avenue. Santa Barbara, CA. 93101 v.805.730.7444 f.805.730.7446 Mechanical/Plumbing Angelika Von Roos, P.E |
||||||
|
Grading Design Robert Flowers, P.E. |
Electrical/Lighting Engineer JMPE 156 W. Alamar Avenue Santa Barbara, CA. 93101 v.805.569.9216 f.805.569.2405 John Maloney, P.E. |
||||||
Construction Team |
|
||||||
![]() (local vendor) |
General Contractor Rick Musmecci (read more) |
||||||
![]() |
Foundation & Concrete Walls Kim Ginnerver
|
||||||
![]() |
Electrical Rob Johnson
|
||||||
![]() |
(a local vendor) |
||||||
| Glazing (local vendor) |
Coast Glass 236 South Magonlia Goleta, Ca. 93117 |
||||||
| Excavation (local vendor) |
Cammozzi Excavation Post Office Box 428 Goleta, Ca. 93116-0428 |
||||||
| HVAC (Heating Cooling and Ventilation (local vendor) |
US Air 900 McMurray Road Buellton, Ca. 93427 |
||||||
| Plumbing (local vendor) |
Kittle Plumbing 5940 Oleny Street Goleta, Ca. 93117 |
||||||
| You may send comments to anyone of these team members or write to them directly. | |||||||